China B&D Exhibition Co., Ltd./ CIEC Exhibition Co., Ltd
 
About fair
 
 
Navigation
Fair Profile
Exhibits
Exhibitors
Participation cost
Participation procedure
Concurrent Forum
Floor plan
Space reservation form
 
  Current location: Participation procedure

Participation procedures

l  Fill in the Space Reservation Form accurately and fax or mail to us.

l  After having received your application, we will send you the formal contract to confirm your booth number, cost and the deposit of your booth. Please confirm the contract and return it to us in one week. The exhibitors should pay 50% of the total rental fee as the deposit to the organizer within 7 working days after your confirmation. The 50% balance shall be paid before January 31st, 2008.

l  Deadline of application: January 15th, 2008

l  Additional services, such as furniture, flowers, water, power and compressed air, should be applied for two months before the exhibition

l  Exhibitors cannot remove or sublet their booths to other companies without permission

l  Exhibitors can only show the exhibits registered in the Space Reservation Form

 

Important Note: Reservation without 50% deposit will be treated as invalid. The deposit is non-refundable and will be deducted from the final invoice for the cost of participation

 

 

 

Monthly E-Newsletter tells you the up-to-date info of CIHE & HVAC and its exhibitors.

 
Which products are your favorite?
 Boiler, Burner
 Floor Heating
 Electric Heating
 Heat Exchanger
 Radiator & Accessories
 Heat Meter, Temperature Controller
 Heat Pump
 Air-conditioning Unit
 Central Air-conditioning Cleaning
 Ventilation Equipment
 Air Treatment Equipment
 Refrigeration Equipment
 Valve & Pipe
 Gas Application
 Solar and Renewable Energy
 
 

Home      About us       Friendly link       FAQs        Contact