| |
![]() |
| Navigation |
|
|
|
|
|
| |
Current location: Construction Management Charges |
|
| Construction Management Charges for the Exhibition Arrangement of
Self-building Booth in Beijing Exhibition Center
|
Item |
Price
(RMB Yuan) |
Remarks |
|
Construction Management Cost |
Domestic : 12/m2·Exhibition period
International: $5/m2 Exhibition period |
|
|
Deposit of Construction and Building |
2000/ Exhibition period. per 50m2 |
Any loss or damage to Exhibition Hall during the arrangement and dismantle of the exhibition booth shall be compensated by the construction unit according to the relevant regulation. Deposit will be refunded after the exhibition completion . |
|
Construction Permission |
20/person. Exhibition period |
Valid the arrangement and dismantle of the exhibition booth |
|
Vehicle Permission |
50/each. Exhibition period |
For front square entrance |
|
Construction Lifting Point for Special Equipment Stand |
500/each. Exhibition period |
Limited to No.11 and 12 Hall, and Special Decorated Stand shall be constructed safely and stably. Any hanging shall be permitted by the Hall. |
|
Overtime Charges of Exhibition Arrangement |
600/hour |
Limited to No. 1, 2 (Level 2), 3, 4, 5, 6, 7, 9, 10 Hall and front square |
|
1000/ hour |
Limited to No. 2 (Level 1)11 and 12 Hall. |
|
Management Charge for the Carpet of aisle |
2/ m2 |
|
|
Temporary Power supply (220V5A) |
100/each |
Only available during the arrangement and dismantle of the exhibition booth, and shall apply to on-site Service Center of BEC |
|
Water Spot |
1000/ each. Exhibition period |
Hall 2 (15mm ×2, 48mm ×2) Hall 3, 4 (48mm×2),
Hall 5 (20mm×1, 48mm ×3) Hall 6 (48mm ×1)
Hall 7 (48mm ×4) Hall.9 (15mm×1, 48mm ×2)
Hall 11,12 (15mm×10 each)
Material and access shall be prepared and accomplished by the builder. |
Power Supply Access( excluding electrical charge)
(Unit: RMB Yuan/each . Exhibition period
220V 5A 300 380V 15A 1500
10A 450 30A 2000
15A 800 60A 2600
30A 1200 100A 3800
150A 4900
S 200A 6500 |
Notes:
1. One exhibition period is 10 days, two exhibition period will be calculated if more than 10 days.
2. Any overtime shall be applied and handle the relevant procedure before PM16:00 each day; or, an additional overtime cost of 50% will be charged.
3. Overtime work for exhibition arrangement shall be no late than 24:00 each day, otherwise 3 times of surcharge shall be paid for exhibition arrangement.
4. Construction unit shall provide all necessary construction drawings, effect diagram and circuit diagram to the on-Site Service Center of BEC to perform the relevant procedure and construction permission one week before exhibition construction, 30% surcharge shall be paid if overdue.
5. Before construction, “Letter of Construction Safety Commitment “ shall be signed between the construction unit and BEC.
6. The construction unit shall be responsible for any safety accident occurred during the construction or exhibition, and it will be prohibited to attend in any future construction in Beijing Exhibition Center.
For more information, please contact: On-site Service Center, BEC Exhibition Branch Co., Ltd.
Tel: 68316677-2135/2356 |
|
| Which products are your favorite? |
|
|
|